Home About Us Latest News Construction Last Post (Slight Return)

Last Post (Slight Return)

E-mail Print

Top [quality] soil dressing bears fruit, literally, on the east side of the C blocks at Woodland Regency. The view is due south. 

A rare glimpse of the kilometres & kilometres of piping discretely concealed underground at Woodland Regency. All the electrical, Internet, satellite, water, irrigation & drainage systems are complete. Still.

Then - The perimeter security wall complete. Foreground – sand dressing laid prior to seeding. The view is due west.

Now - with the addition of hedging, shrubs & trees. 

Then - Sand dressing in front of villa B 8 looking due south. The more observant amongst you will of course be able to deduce the time is 11:43 hrs.

Now. And the time? Trickier, but of course it's 15:55 hrs. 

Then - Sand dressing in front of villa B 5 looking east.

Now. 

Then - Fine topsoil dressing was laid throughout the complex. The view is due north from villa C 6 through the centre of Woodland Regency Bodrum.

Now. 

Then.

Now. Ever so slightly different angle. More becoming don't you think?

Then.

Now. 

Then.

Now - The C blocks east & west respectively before the addition of topsoil dressing & on completion. 

Then.

Now. 

Then.

 

Now - Looking northwest out over Cumberland Properties popular water feature at Woodland Regency

Then - The view over the long & winding road to the freshly painted C blocks.

Now - pretty much the same view, but with a bit more "colouring-in". The man on the path hasn't moved you'll notice, but I'm glad to see he's changed his shirt!

Then - The whole of Woodland Regency now sports a smart undercoat of paint. Installation of glazing is in its final stages. The view is due west.

Now. 

Then - Landscape feature at the foot of the upper pool, one of two available both with children's pools, at Woodland Regency Konacik, looking due north toward the A blocks.

Now. Please note: the sporty wheelbarrow is not a permanent feature. Yes - those trees really did grow that fast!

Then.

 

Now - The view southwest over villa B1 & the C blocks on the west side of the complex. Taken at ground level, not quite as visible as they once were.

Then.

Now. 

Then.

Now. 

Then.

Now. 

Then.

 

Now - The upper pool landscape feature & the north elevation of the A blocks resplendent with travertine treads to adorn their staircases. 

Then.

Now. Just a very slight tilt in the earth's axis.

Then.

Now. That's all looking a bit better.

Then.

Now. Flowerbed worth including this time.

Then.

 

Now - Completed planting at the north end of Woodland Regency looking south east. 

Then.

 

Now - Completed planting between A5 luxury apartments & villa B1 looking due east over the upper pool.

Then.

 

Now - A5. 3’s smart verandas continue to attract attention. 

Then.

Now.

Then.

Now. 

Then.

Now. 

Then.

Now. 

Then.

Now. 

Then.

Now. 

Then.

 

Now - A selection of images from around Cumberland Properties Woodland Regency development, depicting the landscaping, finished painting & installation of optional glazing to the apartments & villas in Bodrum.  

Then.

 

Now - Looking west from the entrance to Woodland Regency at villa B 5 that now boasts a smart raised lawn to its east, as well as the ever popular optional glazing.

Then.

 

Now - Turn around & the view east as you leave Cumberland Properties Woodland Regency past the security building. A man sits in there watching TV 24/7 you know - CCTV monitors that is.

Then.

Now. Somethings never change. 

Then.

 

Now - The alternative way through the woods. Even the tortoise food is growing back.

Last Updated ( Tuesday, 12 June 2012 20:27 )  

TELL US WHAT YOU'D LIKE

Email:
Name Surname:
Tel:
Message: