Home About Us Latest News Construction

Construction (click here)

How does your garden grow?

E-mail Print

 

    

    

    

    

    

    

    

    

    

    

    

    

    

    

    

    

    

    

    

 

Last Updated ( Friday, 15 June 2012 22:10 )
 

Last Post (Slight Return)

E-mail Print

Top [quality] soil dressing bears fruit, literally, on the east side of the C blocks at Woodland Regency. The view is due south. 

A rare glimpse of the kilometres & kilometres of piping discretely concealed underground at Woodland Regency. All the electrical, Internet, satellite, water, irrigation & drainage systems are complete. Still.

Then - The perimeter security wall complete. Foreground – sand dressing laid prior to seeding. The view is due west.

Now - with the addition of hedging, shrubs & trees. 

Then - Sand dressing in front of villa B 8 looking due south. The more observant amongst you will of course be able to deduce the time is 11:43 hrs.

Now. And the time? Trickier, but of course it's 15:55 hrs. 

Then - Sand dressing in front of villa B 5 looking east.

Now. 

Then - Fine topsoil dressing was laid throughout the complex. The view is due north from villa C 6 through the centre of Woodland Regency Bodrum.

Now. 

Then.

Now. Ever so slightly different angle. More becoming don't you think?

Then.

Now. 

Then.

Now - The C blocks east & west respectively before the addition of topsoil dressing & on completion. 

Then.

Now. 

Then.

 

Now - Looking northwest out over Cumberland Properties popular water feature at Woodland Regency

Then - The view over the long & winding road to the freshly painted C blocks.

Now - pretty much the same view, but with a bit more "colouring-in". The man on the path hasn't moved you'll notice, but I'm glad to see he's changed his shirt!

Then - The whole of Woodland Regency now sports a smart undercoat of paint. Installation of glazing is in its final stages. The view is due west.

Now. 

Then - Landscape feature at the foot of the upper pool, one of two available both with children's pools, at Woodland Regency Konacik, looking due north toward the A blocks.

Now. Please note: the sporty wheelbarrow is not a permanent feature. Yes - those trees really did grow that fast!

Then.

 

Now - The view southwest over villa B1 & the C blocks on the west side of the complex. Taken at ground level, not quite as visible as they once were.

Then.

Now. 

Then.

Now. 

Then.

Now. 

Then.

 

Now - The upper pool landscape feature & the north elevation of the A blocks resplendent with travertine treads to adorn their staircases. 

Then.

Now. Just a very slight tilt in the earth's axis.

Then.

Now. That's all looking a bit better.

Then.

Now. Flowerbed worth including this time.

Then.

 

Now - Completed planting at the north end of Woodland Regency looking south east. 

Then.

 

Now - Completed planting between A5 luxury apartments & villa B1 looking due east over the upper pool.

Then.

 

Now - A5. 3’s smart verandas continue to attract attention. 

Then.

Now.

Then.

Now. 

Then.

Now. 

Then.

Now. 

Then.

Now. 

Then.

Now. 

Then.

 

Now - A selection of images from around Cumberland Properties Woodland Regency development, depicting the landscaping, finished painting & installation of optional glazing to the apartments & villas in Bodrum.  

Then.

 

Now - Looking west from the entrance to Woodland Regency at villa B 5 that now boasts a smart raised lawn to its east, as well as the ever popular optional glazing.

Then.

 

Now - Turn around & the view east as you leave Cumberland Properties Woodland Regency past the security building. A man sits in there watching TV 24/7 you know - CCTV monitors that is.

Then.

Now. Somethings never change. 

Then.

 

Now - The alternative way through the woods. Even the tortoise food is growing back.

Last Updated ( Tuesday, 12 June 2012 20:27 )
 

Last Post

E-mail Print

Top [quality] soil dressing is laid, prior to seeding, on the east side of the C blocks at Woodland Regency. The view is due south. 

A rare glimpse of the kilometres & kilometres of piping discretely concealed underground at Woodland Regency. All the electrical, Internet, satellite, water, irrigation & drainage systems are complete. 

The perimeter security wall is now complete. Foreground – sand dressing laid prior to seeding. The view is due west. 

Sand dressing in front of villa B 8 looking due south. The more observant amongst you will of course be able to deduce the time is 11:43 hours.  

Sand dressing in front of villa B 5 looking east.

Fine topsoil dressing is laid throughout the complex. The view is due north from villa C 6 through the centre of Woodland Regency Bodrum

The C blocks east & west respectively before the addition of topsoil dressing & glazing & on completion. 

Looking northwest out over Cumberland Properties popular water feature at Woodland Regency

The view over the long & winding road to the freshly painted C blocks.

The whole of Woodland Regency now sports a smart undercoat of paint. Installation of glazing is in its final stages. The view is due west.  

Landscape feature at the foot of the upper pool, one of three available at Woodland Regency Konacik, looking due north toward the A blocks. 

The view southwest over villa B1 & the C blocks on the west side of the complex. 

The upper pool landscape feature [featuring a couple of likely lads] & the north elevation of the A blocks in the process of receiving travertine treads to adorn their staircases. Finally - best plant those in a row then. 

Completed planting at the north end of Woodland Regency looking south. 

Completed planting between A5 luxury apartments & villa B1 looking due east over the upper pool.

A5. 3’s smart pergola continues to attract attention. 

A selection of images from around Cumberland Properties Woodland Regency development, depicting the recent landscaping, painting & installation of glazing & doors to the apartments & villas in Bodrum.  

Looking west from the entrance to Woodland Regency at villa B 5 that now boasts a smart raised lawn to its east.

Turn around & the view east as you leave Cumberland Properties Woodland Regency past the recently completed & now fully operational security building. 

Alternatively, the way through the woods. 

Last Updated ( Monday, 24 January 2011 13:16 )
 

Home straight

E-mail Print

The paths for A1, A2, A3, A4 & A5 have been completed at Woodland Regency to include the central lighting & irrigation systems. Landscaping has started between A1 & A5. Cumberland has started to plant out the adjacent areas.

    

The area marked in orange on the schematic below indicates the location of paths yet to be completed. All the others are finished.

Installation of the steel balustrades has been completed whilst painting is still in progress.

    

All the carpentry work [kitchen units, fitted wardrobes & doors] has been installed in the A blocks. Installation of the kitchen worktops has been completed.

    

The bathroom sinks have been installed.

    

    

The shower cubicles have been ordered & will be installed during November.

    

All the travertine terrace floors for the C blocks have been completed. The supplier has started to install the PVC doors & windows. Installing the doors & the kitchen units has also commenced.

The main entrance security building nears completion.

    

A room with a view for erm... forester. 

    

The perimeter security wall is almost complete.

    

Cumberland Properties Woodland Regency construction team will be on Kurban holiday between Saturday, 13 November 2010 & Sunday, 21 November 2010. Construction resumes on Monday, 22 November 2010.

I should just have time to top up my legs for that all-over tan. It's a tough job but someone has to do it! 

Last Updated ( Thursday, 23 December 2010 10:04 )
 

Light & dark

E-mail Print

    

    

    

    

     

    

    

     

Last Updated ( Thursday, 23 December 2010 10:02 )
 
  • «
  •  Start 
  •  Prev 
  •  1 
  •  2 
  •  3 
  •  4 
  •  5 
  •  6 
  •  7 
  •  Next 
  •  End 
  • »
Page 1 of 7

TELL US WHAT YOU'D LIKE

Email:
Name Surname:
Tel:
Message: